Kyle Chilton | Posted: 20 Jul 2011 | Updated: 8 Nov 2020

Marriott Center Floor

main image
Image

A joint effort between Special Events and the BYU Paint Shop to re-paint and re-finish the Marriott Center floor was completed today.

The BYU logos and all paint in the keys were removed before camps began in June. The project resumed on July 1 when the entire floor was sanded. The floor was then painted and the words ‘Brigham Young’ were placed on each baseline. Each ‘Brigham Young’ was one large decal.

Before the two layers of finish were applied today, a six-piece vinyl decal Y logo was placed at center court — a new addition to the Marriott Center floor.

Other new features include a West Coast Conference logo inside the 3-point line on each end of the court, the subtraction of one line and the addition of another.

There is now one 3-point line as both the men and the women will shoot from 20 feet 9 inches beginning this fall. The men began shooting from that distance in 2007 while the women’s three-point line had been 19 feet 9 inches.

The line addition is the semi-circle under each basket.  Defensive players will not be able to draw a charge if they have at least one foot in the restricted area marked by the semi-circle.

See the photos above the the floor in progress and the finished product.

Recent Stories

Image
Dallin Hall takes a shot during a 69-68 loss to South Dakota at Vivint Arena.
Cougars fall to South Dakota 69-68 at Vivint Arena

Despite a career night from Dallin Hall and a season high from Rudi Williams, BYU men's basketball fell to South Dakota…

Image
Rudi Williams Westminster 2022-23
BYU returns to Vivint Arena, face South Dakota on Saturday afternoon

BYU men’s basketball will play its fifth neutral site game in 11 days on Saturday, December 3, when the Cougars face…