Kyle Chilton | Posted: 20 Jul 2011 | Updated: 8 Nov 2020

Marriott Center Floor

main image
Image

A joint effort between Special Events and the BYU Paint Shop to re-paint and re-finish the Marriott Center floor was completed today.

The BYU logos and all paint in the keys were removed before camps began in June. The project resumed on July 1 when the entire floor was sanded. The floor was then painted and the words ‘Brigham Young’ were placed on each baseline. Each ‘Brigham Young’ was one large decal.

Before the two layers of finish were applied today, a six-piece vinyl decal Y logo was placed at center court — a new addition to the Marriott Center floor.

Other new features include a West Coast Conference logo inside the 3-point line on each end of the court, the subtraction of one line and the addition of another.

There is now one 3-point line as both the men and the women will shoot from 20 feet 9 inches beginning this fall. The men began shooting from that distance in 2007 while the women’s three-point line had been 19 feet 9 inches.

The line addition is the semi-circle under each basket.  Defensive players will not be able to draw a charge if they have at least one foot in the restricted area marked by the semi-circle.

See the photos above the the floor in progress and the finished product.

Recent Stories

Image
2023 NABC Team Academic Excellence Award
BYU earns NABC Team Academic Excellence Award

The NABC announced the recipients of the 2022-23 NABC Team Academic Excellence Awards and NABC Honors Court on Thursday…

Image
Coach Pope Weber State 2022-23
Pope set to participate in “Big 12 Hoops in the Park”

The Big 12 Conference announced on Thursday morning that BYU men’s basketball head coach Mark Pope will help lead youth…